Across Southeast Asia, minerals policy has moved from setting the rules of the game to setting the score. Governments are deciding how much can be mined each year, the minimum price it can be sold for, and whether it can leave the country unprocessed. The aim, in the words of Malaysia’s trade minister, is “to prevent the export of cheap unprocessed raw materials so that value is added to Malaysia“.
For a mining group, that turns policy into a production input. It also tends to stretch the group across borders, with mines in one country, a trading desk in Singapore and capital raised in Hong Kong. Each entity sees a different side of the same policy decision.
Indonesia: volume and price set by the state
Indonesia shows how far this can go. Under Ministerial Regulation (Permen ESDM) No. 17 of 2025, the RKAB work plan and budget that every mining licence holder must have approved was shortened from three years to one year, effective October 3, 2025. When 2026 approvals ran late, the ministry allowed companies to continue producing at up to 25% of their planned 2026 output while they waited.
The nickel quota then moved several times. The ministry first set 260 million to 270 million tonnes for 2026, about a third below the 379 million tonnes approved for 2025, and in late October finalised a revised quota of 290 million to 300 million tonnes. The benchmark price (HPM), which sets the minimum price at which miners can sell ore to domestic smelters, was revised twice in the same year, and the September change cut the benchmark for 1.2% nickel limonite by 45%, from US$44.97 to US$24.89 per wet metric tonne (about RM183 to RM102). Submissions for 2027 closed on 15 November 2026, so most Indonesian miners are budgeting for next year around a quota they do not yet have.
Thailand: building domestic supply
Thailand is focused on developing new production. The government is pushing three potash projects in the northeast that could reach combined capacity of about 3.2 million tonnes a year, with the first expected to produce in the second half of 2027 and the largest targeting 2030, subject to a planned capital increase. The country currently imports about 1 million tonnes of potash a year worth ฿14 billion. Thailand has also signed a critical minerals memorandum with the United States, which its Cabinet has confirmed is non-binding and grants no exclusive rights.
Pre-production projects of this kind carry their own finance demands, from capitalising development costs and managing staged capital raises to tracking obligations to the state, which in one project’s case have become a dispute over special payments.
Singapore and Hong Kong: where minerals are traded and financed
The region’s mining value chain often runs through its two financial centres. Singapore hosts three of the top five iron ore producers globally, and its Global Trader Programme offers concessionary tax rates of 5%, 10% or 15% on qualifying trading income. Hong Kong hosted Zijin Gold International’s US$3.7 billion spin-off, the largest mining IPO globally since 2012, Indonesian gold miner Merdeka has pursued a Hong Kong listing; and the number of LME-approved metal warehouses in the city has grown from four to 15.
A typical group structure might therefore include a mining entity in Indonesia or Malaysia keeping local books, a trading company in Singapore working in US dollars and a listed or listing parent in Hong Kong. When a quota, price floor or export rule changes, it affects the mine’s volumes, the trader’s margins, the transfer price between them and the parent’s guidance to investors at the same time.
Malaysia: export eligibility as the lever
Malaysia uses a different lever. The government set a moratorium on raw rare earth exports for a short-term phase from 2025 to 2027 to support its midstream processing industry. In October 2026 it released guidelines for the conditional export of raw rare earths, allowing shipments for research and processing, subject to a commitment to develop processing activities locally.
For a producer, that means revenue depends on an approval as well as a buyer. Material can sit in inventory while an export application is assessed, and a local processing commitment becomes an obligation that has to be budgeted, tracked and reported.
What a policy-driven plan needs
Mining groups that plan well in this environment tend to share a few practices. They keep one version of the plan that traces from the regulatory submission, such as Indonesia’s RKAB, to the internal budget and to actuals. They run scenarios as standard, modeling different quota, price floor, and export approval outcomes in place of a single forecast. They tie purchase commitments for fuel, contractors and spares to approved volumes. They refresh inventory and stockpile valuations whenever a benchmark price or export status changes. They also price intercompany sales between the mine and trader on a documented basis, so a policy change flows through to each entity’s results and tax position in a way they can explain.
Oracle NetSuite brings these elements into one system, with budgets by subsidiary, location, and pit; purchase approvals routed against budget; and NetSuite Planning and Budgeting for driver-based scenarios on the same data the ledger uses. OneWorld consolidates the mine, trading and holding entities in their own currencies and standards, and our PS Coretax solution keeps Indonesian tax compliance inside the platform.
Why Choose PS Global
Over 18 years, we have implemented Oracle NetSuite for resource, construction, and project-based businesses, including nickel mining companies in Indonesia, and we built PS Coretax specifically for Indonesian tax compliance. With our headquarters in Singapore and our Hong Kong team now operating as PS Global HK, we can support the full chain of a mining group, from the mine site to the trading desk and the listed parent.
We support clients across Singapore, Malaysia, Indonesia, Thailand, Vietnam, Hong Kong, the Philippines, China, Korea, Japan and Taiwan, and our Managed Services team can keep configurations current as quotas, benchmark formulas and export rules change.
If next year’s plan still rests on a single quota and a single price, we would be glad to help you build one that can absorb the next policy decision.